ZeroGrid

Residential Case Study: Solar PV and Battery Storage Installation

Client: Dr. Zaman

System size: 9.1 kWp Solar PV with 20.48 kWh Battery Storage

Location: East Riding of Yorkshire

Overview

ZeroGrid was commissioned by Dr. Zaman to design and install a state-of-the-art solar photovoltaic (PV) system, tailored to meet his energy requirements, and reduce reliance on grid electricity. After conducting an in-depth analysis of the property and energy usage, our team devised a customised solution aimed at reducing the client’s electricity bills by over 70%.

System Details

  • Solar PV Array: 9.1 kWp
  • Total Panels: 20 x 455W All-Black AIKO Solar Panels
  • Hybrid Inverter: 1 x 6 kW Duracell Hybrid Inverter
  • Battery Storage: 4 x 5.12 kWh Duracell Batteries (Total 20.48 kWh)
  • Energy Diversion: 1 x Solar iBoost Immersion Diverter (to optimize energy use for hot water)
  • Mounting Solution: Clenergy Roof Mounting System

Benefits

  • Significant Cost Savings: The system is projected to reduce electricity bills by more than 70%, allowing the client to become far less dependent on rising energy costs from the grid.
  • Energy Independence: With the integration of a 20.48 kWh battery storage system, the client can store excess energy generated during the day for use at night, further maximizing self-consumption and reducing grid reliance.
  • Smart Energy Management: The Duracell Hybrid Inverter ensures seamless integration between solar generation, battery storage, and flexible smart tariffs on offer from Octopus Energy.
  • Enhanced Sustainability: The installation helps reduce the household’s carbon footprint, contributing to a greener and more sustainable future.

Why ZeroGrid?

ZeroGrid takes pride in delivering personalised solar energy solutions that prioritise efficiency, reliability, and customer satisfaction. From initial consultation through to post-installation support, we ensure that every system is optimised for maximum performance.

Share this news story:

Start Your Next Renewable Project Today!

    Discover More Case Studies


    Warning: Undefined array key "src" in /home/bubblestaging/www/www/wp-content/plugins/elementor/core/page-assets/loader.php on line 95

    Warning: Undefined array key "dependencies" in /home/bubblestaging/www/www/wp-content/plugins/elementor/core/page-assets/loader.php on line 95

    Warning: Undefined array key "version" in /home/bubblestaging/www/www/wp-content/plugins/elementor/core/page-assets/loader.php on line 95